How to Write a Software Requirements Document for an Outsourced Project

A software requirements document for an outsourced project explains what the software must do, for whom, under which constraints, and how you will know each part is finished. Write it in plain language: the business goal, the users, the features as user stories with acceptance criteria, the non-functional needs, the integrations, and what is out of scope. It should let an outside team estimate and build without guessing.

This guide is written for US small and mid-sized businesses hiring an outside development team for the first time, or the first time in a while. Sources were checked on 17 November 2026.

Why a requirements document matters more when you outsource

An in-house team can walk down the hall and ask what you meant. An outsourced team, often in another time zone, fills gaps with assumptions. Each assumption becomes either a change request later or a feature that does not match what you had in mind.

A good requirements document does three jobs:

  • It makes estimates comparable. If you send the same document to several vendors, you can compare their quotes on the same scope.
  • It sets the definition of finished. Acceptance criteria turn "the login works" into checks both sides can agree on.
  • It protects the budget. A clear out-of-scope list is the cheapest way to prevent scope creep.

It does not need to be long. A clear ten-page document is more useful than a vague fifty-page one.

Is there a standard format for a software requirements specification?

Yes. The international standard for requirements engineering is ISO/IEC/IEEE 29148, last revised in 2018. IEEE describes it as containing "provisions for the processes and products related to the engineering of requirements for systems and software products and services throughout the life cycle." Its 2011 edition replaced the older IEEE 830-1998, which many SRS templates online are still based on.

You do not need to follow a standard to the letter for a small business project. It is useful as a checklist of what good requirements look like: each one necessary, clear, testable and consistent with the others.

What to include: a simple outline

Use these sections as a starting point and drop any that do not apply.

  1. Purpose and business goal. One or two paragraphs: the problem, who has it, and what success looks like for the business.
  2. Users and roles. Who will use the software (customers, staff, admins) and what each role can see and do.
  3. Scope. The features in this version, as a numbered list.
  4. Out of scope. What this version will not do. Be explicit, for example "no mobile app in phase one" or "payments handled by our existing provider."
  5. Functional requirements. Each feature described as user stories with acceptance criteria (see below).
  6. Non-functional requirements. Performance, security, accessibility, browsers and devices supported, data retention, and any compliance needs that apply to your industry.
  7. Integrations and data. Systems the software must connect to (CRM, accounting, email, payment), who owns each account, and what data moves between them.
  8. Design inputs. Brand guidelines, wireframes, examples of products you like and why.
  9. Constraints. Budget range, deadline drivers, required technologies or hosting, and who owns the code and accounts.
  10. Open questions. Things you have not decided yet. Listing them is better than hiding them.

How to write requirements a remote team can build from

Use user stories with acceptance criteria

A common format is: "As a [role], I want [action] so that [benefit]." Under each story, list acceptance criteria: concrete conditions that must be true for the story to count as done.

For example:

  • Story: As a customer, I want to reset my password so that I can get back into my account without calling support.
  • Acceptance criteria: a reset link is emailed to the address on file; the link expires after a set time; the old password stops working after a reset; an unknown email address shows the same message as a known one, so the form does not reveal who has an account.

Acceptance criteria are what your QA team, or you, will test against at handover.

Be specific, not technical

You do not need to choose the database or framework. Describe behavior, rules and limits. "Search returns results as the user types" is a requirement. "Use Elasticsearch" is a design decision, best left to the team unless you have a reason to fix it.

Prioritize

Mark each feature as must have, should have or could have. When the budget or deadline gets tight, everyone already knows what to drop first.

Show, do not only tell

A rough sketch of a screen, a sample report, or a screenshot of a spreadsheet you use today often explains more than a page of text.

Requirements documents and agile development

Many outsourced teams work in an agile way, usually Scrum. That does not make a requirements document unnecessary. The Agile Manifesto values "working software over comprehensive documentation," and it also says "while there is value in the items on the right, we value the items on the left more." The point is not to skip documentation but to keep it useful.

In Scrum, requirements live in the Product Backlog, which the Scrum Guide defines as "an emergent, ordered list of what is needed to improve the product." Your requirements document becomes the first version of that backlog. Refinement, which the guide describes as "breaking down and further defining Product Backlog items into smaller more precise items," continues during the project, so the document can stay short at the start and grow in detail as work begins.

Agree with the team on a shared Definition of Done as well, such as code reviewed, tested, deployed to a staging site, so finished means the same thing on both sides.

Common mistakes to avoid

  • Writing only the happy path. Say what happens when a payment fails, a field is empty or a user loses connection.
  • Leaving out the admin side. Someone needs to manage users, content and settings. Those screens are features too.
  • Forgetting who owns what. State that code, repositories, domains and cloud accounts are in your company's name.
  • Treating the document as frozen. Keep it versioned and agree how changes are requested, estimated and approved.
  • Skipping the out-of-scope list. It is the section most often missing and the one that prevents the most arguments.

How to work with the vendor on the document

Share a draft before asking for quotes and invite questions. The questions a vendor asks tell you a lot about how carefully they read. A good partner will point out gaps, suggest a smaller first release where it makes sense, and turn your document into a backlog with estimates.

If you are scoping a project now, our custom software development team can review your draft and help turn it into a buildable plan, and our software testing and QA team can turn acceptance criteria into test cases. We are a remote team of developers around the world, AI first, working with businesses across the US.

FAQ

How long should a software requirements document be?

As long as it needs to be clear, and no longer. For a small business web app, a short document built around user stories and acceptance criteria is usually enough. Large or regulated systems need more.

What is the difference between an SRS and a PRD?

A product requirements document (PRD) usually focuses on the product goal, users and features from a business view. A software requirements specification (SRS) goes further into detailed functional and non-functional requirements. For an outsourced project, a combined document covering both is often enough.

Should I write the requirements myself or pay the vendor to do it?

Write the business goal, users, features and out-of-scope list yourself, since only you know them. Many vendors offer a paid discovery phase to turn that into detailed requirements and estimates, which is worth considering for larger projects.

Do I need a requirements document for an agile project?

Yes, in a lighter form. It becomes the starting Product Backlog and gives the team the goals, constraints and priorities that individual stories do not capture.